Designed erosion control plan sets (Initial/interim and final) including earth dikes, drainage swales and sediment traps to reduce overall maintenance and impact to the project area
Provided the client with a SWMP narrative that met both the owner and Army Corps of Engineer standards for the project.
Conducted weekly and post storm event monitoring of construction BMPs from installation through various phases of the project.
Managed the SWMP and erosion control plan sets for the project.
Prepared management plans for vegetation, wildlife and construction dust monitoring.
Conducted pre-construction and ongoing vegetation and wildlife surveys.
Installed real time construction dust (PM10) monitors for the project.
Review/Monitor real time PM10 data and provide to both the client and Colorado Department of Transportation (CDOT) on a daily basis.